SIDEM Front Lower Position for Tesla Model 3
$149.95
$149.95

• Front Lower Position for Tesla Model 3 - Priced Each
• High quality OE Replacement part by SIDEM
• Addresses clunking, knocking, or failed ball joints, worn, sloppy, or failed bushings
• Fits all Tesla Model 3 up to 2024
• SIDEM Reference: 15075
• OE Reference 1044341-00-C, 1044341-00-D, 1044341-00-E, 1044341-99-D
1344341-00-B, 1344341-10-B

EUROPEAN MANUFACTURER FOR OEM & THE INDEPENDENT AFTERMARKET
Sidem is a family-owned company founded in 1933, the leading specialist in engineering and manufacturing of steering and suspension parts for Original Equipment Manufacturers (OEM) and the Independent Aftermarket (IAM). Sidem has its own in-house engineering team, an IATF-certified manufacturing plant and a central warehouse, all based in Europe.
OWN PRODUCTION IN EUROPE
Located in Suceava, Romania, Sidem’s manufacturing facility is a testament to its commitment to quality and efficiency. By maintaining control over the entire manufacturing process, from design to production and warehousing, Sidem ensures the consistent delivery of premium products and services to its customers.
Last but not least it is important to note that our manufacturing plant uses the same quality standards and processes for all its products. Also for the aftermarket, parts are engineered, tested and manufactured according to the IATF and ISO quality standards.
OEM CERTIFIED SUPPLIER.
Sidem’s production facility is IATF 16949 certified, a Quality Management Standard for the automotive industry, in addition to the ISO9001 certificate. IATF 16949 is endorsed by the International Automotive Task Force (IATF), ensuring uniform quality requirements globally. This certification assures we meet the rigorous standards set by automobile manufacturers.
BUT WHAT EXACTLY DOES THIS IATF-CERTIFICATION MEAN?
EFFICIENT MANUFACTURING.
The Sidem manufacturing plant is ISO 14001 certified, which means it has an effective environmental management system. To comply with ISO 14001, a company must take steps to manage its environmental responsibilities effectively. Sidem implements lean manufacturing, which focuses on waste reduction and higher efficiency by streamlining processes. The 5S methodology helps to organize the workplace to improve productivity, safety and quality. Training of the staff and continuous improvement actions guarantee we meet our efficiency standards or improve if needed. Sidem never stops investing in the production plant. We focus on automation and energy-efficiency. Some examples:
WARNING: Cancer and Reproductive Harm — www.P65Warnings.ca.gov
EVANNEX
Glove Box Organizer for Tesla Model 3 and Model Y